Talegaon Dabhade in Maval taluka has grown into a major industrial destination around the Talegaon MIDC, attracting automobile, engineering and equipment manufacturers with its position between Mumbai and Pune. New plants and vendor units in Talegaon MIDC often need large-span sheds, heavy-duty floors and fast timelines to match their customers' start-of-production dates.

KAYVEES GROUP has been building for industry since 1996. We take your Talegaon project from plot study and layout planning through civil and structural works, PEB sheds, utilities and approvals, up to a ready-to-operate factory. One team, one point of contact and one accountable schedule.

1996Building for industry since
25+Industrial clients served
TurnkeyPlanning to handover
One RoofLand, approvals & construction
What We Build in Talegaon

Industrial Construction Services in Talegaon

From a single production shed to a complete manufacturing campus, we deliver every structure an industrial unit in Talegaon needs.

PEB Factory Sheds

Pre-engineered steel buildings with large clear spans, crane-ready columns and quick erection, ideal for production and assembly lines.

RCC Industrial Buildings

Multi-storey RCC structures for engineering units, clean manufacturing, stores and administration blocks.

Warehouses & Logistics Sheds

Warehouses with heavy-duty flooring, loading docks and truck movement areas for supply-chain and vendor operations.

Civil & Structural Works

Site levelling, foundations, machine foundations, industrial flooring, compound walls and structural steel work.

Site Infrastructure

Internal roads, storm-water drainage, water storage, electrical substation yards, security cabins and parking.

Industrial Offices & Interiors

Admin blocks, canteens and office interiors designed and executed in-house, so your factory is ready to work from day one.

Our Turnkey Process

How We Deliver Your Talegaon Factory

A clear six-stage process keeps your project transparent, on budget and on time.

01

Plot Study & Requirement

We visit your Talegaon plot, study soil, access and services, and understand your production flow.

02

Layout & Design

Functional factory layout, architectural drawings and structural design matched to your process and budget.

03

Approvals

Building plan sanction and statutory permissions are prepared and followed up by our team.

04

Civil & Structure

Foundations, RCC and PEB structure are executed with quality checks and safety at every stage.

05

Utilities & Finishing

Flooring, roofing, cladding, drainage, roads, plumbing and electrical provisions are completed.

06

Handover

Final inspection, completion documents and handover of a ready-to-operate facility.

About the Location

Talegaon at a Glance

Key facts about Talegaon for anyone planning a project in the area.

LocationMaval Taluka, Pune District
Industrial ZonesTalegaon MIDC (Talegaon Industrial Area) and private industrial parks
Nearby VillagesAmbi, Navlakh Umbre, Induri, Varale, Jadhavwadi, Vadgaon Maval
ConnectivityMumbai–Pune Expressway, Old Mumbai–Pune Highway, Talegaon railway station, Talegaon–Chakan Road
Key IndustriesAutomobile, engineering, construction equipment, electronics, warehousing
Approvals Support

Permissions We Help With

Our team handles the paperwork alongside construction, so approvals do not hold up your start date.

  • MIDC / PMRDA building plan approval
  • Factory plan approval from DISH
  • MPCB Consent to Establish & Operate
  • Fire NOC and fire safety compliance
  • MSEDCL power connection support
  • Completion and occupancy certificates

Read more about approvals in Talegaon

Our Work

Factory Construction Projects by Kayvees

A few of the industrial facilities we have planned and built for manufacturing clients in the Pune region.

FAQs

Industrial Construction in Talegaon – FAQs

Yes. KAYVEES GROUP undertakes industrial and factory construction in Talegaon, including Talegaon MIDC and nearby Ambi, Navlakh Umbre, Induri and Vadgaon Maval.

Yes. We provide end-to-end turnkey solutions covering plot study, layout design, approvals, civil and structural works, PEB sheds, utilities, finishing and final handover, so you deal with a single team for the complete project.

We construct PEB factory sheds, RCC industrial buildings, warehouses, logistics sheds, administration blocks, canteens and supporting infrastructure such as internal roads, drainage and compound walls.

Yes. Our team supports building plan approval from MIDC for plots within Talegaon MIDC, and PMRDA or the Talegaon Dabhade Municipal Council for areas outside MIDC, along with factory plan approval, MPCB consent, Fire NOC, power connection and completion certificates.

The timeline depends on the built-up area, type of structure and approvals. A standard PEB factory shed is usually faster than an RCC building. We share a detailed schedule after studying your plot and requirements.

We cover Talegaon Dabhade, Talegaon MIDC and nearby villages including Ambi, Navlakh Umbre, Induri, Varale, Jadhavwadi and Vadgaon Maval.

Call us on +91-98220 53662 or +91-83789 38387, or send your plot details and requirements through our enquiry form. Our team will contact you to discuss the project and share an estimate.

Planning a Factory in Talegaon?

Share your plot details and built-up area requirement. Our team will suggest a suitable layout, construction approach and an estimated timeline for your project.